Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Jun-2024 05:24:33 PM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: BHIGAWA NANKARI
Work Code: 1725006010/IF/12 (कपिल धारा मय मेढबंधान परमानन्‍द कडवाजी (भिगावानानक)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2011-2012 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 27/5/2011 Work start date : 30/5/2011
Present status : Not Exist Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : bhi235 Sanction Date : 28/5/2011
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
98000 52000 0 0 0 0 0 52000 0 150000
Financial Sanction Details
Financial\Administrative Sanction No: bhi11 Financial\Administrative Sanction Date 30/5/2011
Fin. Sanc. Amt. (in Rs) NREGA:150000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
150000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil88.1390.097939.6317
2Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1.5:3 (1cement, 1.5sand, 3graded stone aggregate 20 mm nominal size)5.092557.613018.184
3False work for R.C.C. and P.C.C. work in plinth and foundation102128.613117.2
4Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars14351.77393.1
5Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 11109511095
6Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil22.6775.31707.051
7Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum22.67117.12654.657
8Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)43.34226.379810.8758
9Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.158.4393.362298.72
10work charge12090420904
Total Activity 150000
S.NoMaterialQuantityUnit PriceTotal
110 mm HG Chips120002000
220 M.M. METAL3.528042830.08
340 mm size HG metal120002000
4Blasting Holas1807012600
5Board115001500
6BULLOCK CART204008000
7Cement1290290
8Cement(bori)253057625
9Centering and Shuttering7590.66795
10Contagecny2001200
11IRON SARIYA18360.311034.9
12Photograph1025250
13RR stone (Granite)1100100
14Sand1.87341321.2
15Sand (Filling)130003000
Total Material 59600