State: MADHYA PRADESH District: KHANDWA Block: BALADI Panchayat: LAHADPUR MAL
Work Code: 1725001027/RC/22012034213560 (NALI NIRMAN HABIB KE GHAR SE ALABAKS PATEL KE GHAR)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 15/4/2013 Work start date : 6/3/2014
Present status : Earthern road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 679/12 Sanction Date : 26/2/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
99000 254000 0 0 0 0 0 254000 0 353000
Financial Sanction Details
Financial\Administrative Sanction No: 24/12 Financial\Administrative Sanction Date 27/2/2014
Fin. Sanc. Amt. (in Rs) NREGA:353000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
353000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Loose or soft soil000
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)59.093478.5205544.565
3False work for R.C.C. and P.C.C. work in plinth and foundation544.2154.283915.64
4Collection of approved soil having CBR not less than 5, including stacking at quarry.30.61263855.6
5Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 30.66183.6
6Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 57.94321854.08
7Transportation of metal 193.0912.992508.2391
8Transportation of metal 193.0926.595134.2631
9Transportation of metal 214.550.2210772.19
10Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.296.5497.728971.958
11work charge981009800
Total Activity 353000
S.NoMaterialQuantityUnit PriceTotal
120 MM B.T.METAL26.26100026260
2CEMENT(BEGS)377300113100
3Centring & Shuttering544.2103.6656411.772
4Display board130003000
5Mason (semi skilled)153004500
6sand cum50.22100050220
Total Material 254000