State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: SAGRON
Work Code: 1711003014/WC/9993650367 (निर्मल नीर कूप कार्य ग्राम सगरोन)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 26/1/2014 Work start date : 5/3/2014
Present status : Non-existent Proposed Status : Artificial Recharge of Well Through Sand Filter
Tech Sanction Details
Technical Sanction No. : 1451/sa Sanction Date : 11/2/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
447000 290000 0 0 0 0 0 290000 0 737000
Financial Sanction Details
Financial\Administrative Sanction No: 84/s Financial\Administrative Sanction Date 20/2/2014
Fin. Sanc. Amt. (in Rs) NREGA:737000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
737000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard120002000
2Contingency11400014000
3Work charge11000010000
4Labour only for item no.0402238.635.88541.88
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)4.523089.913966.348
6Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)2.222404.15337.102
7Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used4.52169.4765.688
8Random/ uncoursed rubble masonry in plinth and foundation, stones laid dry, well bounded, faced with selected stones and built with through stones evenly placed at the rate of two per sqm223.231641366320.43
9Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:6 (1cement, 6sand)11.412247.525643.975
10Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars210002000
11TRANSPORTATION OF MATERIAL15533655336
12Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Flush pointing30.4580.22442.09
13Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil135.02126.5917092.1818
14Earth work for well excavation-Soil lift from 3.00 m. to 3.50 m.36.8100
15Earth work for well excavation-Hard moorum lift from 1.5 m. to 2.00 m.42.24137.35799.552
16Earth work for well excavation-Hard moorum lift from 2.00 m. to 2.50 m.40.23144.45809.212
17Earth work for well excavation-Hard moorum lift from 2.50 m. to 3.00 m.38.27151.55797.905
18Earth work for well excavation-Hard moorum lift from 3.00 m. to 3.50 m.36.81158.65838.066
19Earth work for well excavation-Hard moorum lift from 5.50 m. to 6.00 m.32.21194.16251.961
20Earth work for well excavation-Hard moorum lift from 3.50 m. to 4.00 m.35.87165.75943.659
21Earth work for well excavation-Hard moorum lift from 4.00 m. to 4.50 m.34.94172.86037.632
22Earth work for well excavation-Hard moorum lift from 4.50 m. to 5.00 m.34.02179.96120.198
23Earth work for well excavation-Hard moorum lift from 5.00 m. to 5.50 m.33.111876191.57
24Earth work for well excavation-Hard moorum lift from 6.00 m. to 6.50 m.31.33203.56375.655
25Earth work for well excavation-Hard moorum lift from 6.50 m. to 7.00 m.30.46212.96484.934
26Earth work for well excavation-Hard moorum lift from 7.00 m. to 7.50 m.29.6222.36580.08
27Earth work for well excavation-Hard moorum lift from 7.50 m. to 8.00 m.28.75231.76661.375
28Earth work for well excavation-Hard moorum lift from 8.00 m. to 8.50 m.27.92241.16731.512
29Earth work for well excavation-Hard moorum lift from 10.50 m. to 11.00 m.23.94290.56954.57
30Earth work for well excavation-Hard moorum lift from 8.50 m. to 9.00 m.27.1250.56788.55
31Earth work for well excavation-Hard moorum lift from 9.00 m. to 9.50 m.26.29259.96832.771
32Earth work for well excavation-Hard moorum lift from 9.50 m. to 10.00 m.25.49269.36864.457
33Earth work for well excavation-Hard moorum lift from 10.00 m. to 10.50 m.24.71278.76886.677
34Earth work for well excavation-Hard moorum lift from 11.00 m. to 11.50 m.23.18302.37007.314
35Earth work for well excavation-Hard moorum lift from 11.50 m. to 12.00 m.22.43314.17045.263
36Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 12.00 m. to 12.50 m.22.07631.113928.377
37Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 12.50 m. to 13.00 m.20.63647.713362.051
38Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 13.00 m. to 13.50 m20.63664.313704.509
39Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 13.50 m. to 14.00 m.19.23680.913093.707
40Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 14.00 m. to 14.50 m.17.88697.512471.3
41Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 14.50 m. to 15.00 m.16.58714.111839.778
Total Activity 737000
S.NoMaterialQuantityUnit PriceTotal
120 MM Graded Metal000
240 MM AGGREGATE28501700
3AngleRod000
4Cement7730023100
5CONTANGANCY11100011000
6desal pump rent2050010000
7Display board120002000
8Masonry Stone223.23637142197.51
9Rubble Stone1.38150.4207.552
10Transpotation Charges15533655336
11कारीगर11730035100
12रेत7.810918509.8
Total Material 290000