S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Contingency | 1 | 14000 | 14000 |
3 | Work charge | 1 | 10000 | 10000 |
4 | Labour only for item no.0402 | 238.6 | 35.8 | 8541.88 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 4.52 | 3089.9 | 13966.348 |
6 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 2.22 | 2404.1 | 5337.102 |
7 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 4.52 | 169.4 | 765.688 |
8 | Random/ uncoursed rubble masonry in plinth and foundation, stones laid dry, well bounded, faced with selected stones and built with through stones evenly placed at the rate of two per sqm | 223.23 | 1641 | 366320.43 |
9 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:6 (1cement, 6sand) | 11.41 | 2247.5 | 25643.975 |
10 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars | 2 | 1000 | 2000 |
11 | TRANSPORTATION OF MATERIAL | 1 | 55336 | 55336 |
12 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Flush pointing | 30.45 | 80.2 | 2442.09 |
13 | Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 135.02 | 126.59 | 17092.1818 |
14 | Earth work for well excavation-Soil lift from 3.00 m. to 3.50 m. | 36.81 | 0 | 0 |
15 | Earth work for well excavation-Hard moorum lift from 1.5 m. to 2.00 m. | 42.24 | 137.3 | 5799.552 |
16 | Earth work for well excavation-Hard moorum lift from 2.00 m. to 2.50 m. | 40.23 | 144.4 | 5809.212 |
17 | Earth work for well excavation-Hard moorum lift from 2.50 m. to 3.00 m. | 38.27 | 151.5 | 5797.905 |
18 | Earth work for well excavation-Hard moorum lift from 3.00 m. to 3.50 m. | 36.81 | 158.6 | 5838.066 |
19 | Earth work for well excavation-Hard moorum lift from 5.50 m. to 6.00 m. | 32.21 | 194.1 | 6251.961 |
20 | Earth work for well excavation-Hard moorum lift from 3.50 m. to 4.00 m. | 35.87 | 165.7 | 5943.659 |
21 | Earth work for well excavation-Hard moorum lift from 4.00 m. to 4.50 m. | 34.94 | 172.8 | 6037.632 |
22 | Earth work for well excavation-Hard moorum lift from 4.50 m. to 5.00 m. | 34.02 | 179.9 | 6120.198 |
23 | Earth work for well excavation-Hard moorum lift from 5.00 m. to 5.50 m. | 33.11 | 187 | 6191.57 |
24 | Earth work for well excavation-Hard moorum lift from 6.00 m. to 6.50 m. | 31.33 | 203.5 | 6375.655 |
25 | Earth work for well excavation-Hard moorum lift from 6.50 m. to 7.00 m. | 30.46 | 212.9 | 6484.934 |
26 | Earth work for well excavation-Hard moorum lift from 7.00 m. to 7.50 m. | 29.6 | 222.3 | 6580.08 |
27 | Earth work for well excavation-Hard moorum lift from 7.50 m. to 8.00 m. | 28.75 | 231.7 | 6661.375 |
28 | Earth work for well excavation-Hard moorum lift from 8.00 m. to 8.50 m. | 27.92 | 241.1 | 6731.512 |
29 | Earth work for well excavation-Hard moorum lift from 10.50 m. to 11.00 m. | 23.94 | 290.5 | 6954.57 |
30 | Earth work for well excavation-Hard moorum lift from 8.50 m. to 9.00 m. | 27.1 | 250.5 | 6788.55 |
31 | Earth work for well excavation-Hard moorum lift from 9.00 m. to 9.50 m. | 26.29 | 259.9 | 6832.771 |
32 | Earth work for well excavation-Hard moorum lift from 9.50 m. to 10.00 m. | 25.49 | 269.3 | 6864.457 |
33 | Earth work for well excavation-Hard moorum lift from 10.00 m. to 10.50 m. | 24.71 | 278.7 | 6886.677 |
34 | Earth work for well excavation-Hard moorum lift from 11.00 m. to 11.50 m. | 23.18 | 302.3 | 7007.314 |
35 | Earth work for well excavation-Hard moorum lift from 11.50 m. to 12.00 m. | 22.43 | 314.1 | 7045.263 |
36 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 12.00 m. to 12.50 m. | 22.07 | 631.1 | 13928.377 |
37 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 12.50 m. to 13.00 m. | 20.63 | 647.7 | 13362.051 |
38 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 13.00 m. to 13.50 m | 20.63 | 664.3 | 13704.509 |
39 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 13.50 m. to 14.00 m. | 19.23 | 680.9 | 13093.707 |
40 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 14.00 m. to 14.50 m. | 17.88 | 697.5 | 12471.3 |
41 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 14.50 m. to 15.00 m. | 16.58 | 714.1 | 11839.778 |