Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 06:45:21 AM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: PANDHANA Panchayat: DIWAL
Work Code: 1725007024/WC/22012034570413 (वाटर हर्वेसिट्ग कार्य पंचायत भवन दीवल)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2020-2021 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2020 Work start date : 18/7/2020
Present status : Existing Proposed Status : Construction of Community Water Harvesting Ponds
Tech Sanction Details
Technical Sanction No. : 1725007/2020-2021/283561/TS Sanction Date : 29/7/2020
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
4374.87 6975.68 624.95 1151.81 0 0 0 8800 0 13127.31
Financial Sanction Details
Financial\Administrative Sanction No: 1725007/2020-2021/283561/AS Financial\Administrative Sanction Date 7/8/2020
Fin. Sanc. Amt. (in Rs) NREGA:13127 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
13200
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m4.557.6088888888889259.24
2(i) Cement mortar 1:5 (1cement, 5sand)1.23926.291666666674711.55
3(c) Cement mortar 1:5 (1cement, 5sand)5.84103.895547945205606.75
4(c) Cement mortar 1:5 (1cement, 5sand)6.16143.646103896104884.86
5Collection of rubble masonry (size 0.014cum to 0.06cum) other then black trap, basalt or granite.2.25635.2711111111111429.36
6Collection of through/ bond stones.1.131096.902654867261239.5
7(d) 2.0 Km. Lead1.13126.690265486726143.16
8(IV) 2.0 Km. Lead2.25111.191111111111250.18
9(V) 2.5 Km. Lead1.13117.752212389381133.06
10(c) 100 mm dia.16159.9481252559.17
11b (ii) Dense or hard soil for Well Work3.38197.659763313609668.09
12c (ii) Hard moorum for Well Work1.13214.495575221239242.38
Total Activity 13200
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.02188518.585
20084-Hire charges of Diesel truck - 9 tonne (without POL)0.12992242291.2358
30367-Portland Cement0.13055511719.1855
40983-Fine sand (zone IV)0.45041076.25484.743
51235-Diesel oil0.86236858.6364
65001-Mobil oil0.0309182.95.65161
77900-Modular common burnt clay bricks of class designation 7.56244.132577.12
8MR11683-A.C. Pipe 100mm dia (each of 3m long)5.328178.24949.66272
9MR6034-Blaster (Semi-Skilled)0.033832911.1202
10MR6035-Gelatine (80%)0.641365.642.06928
11MR6036-Electric detonator2.463816.440.40632
12MR6037-Fuse coil (10m long)1.01258.28.3025
13MR6038-Drilling of holes 25mm dia 0.75m deep2.531361.51155.700263
Total Material 5400