State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: BARAUA(P)
Work Code: 1703004052/RC/22012034337436 (Sudur Khet Sampark marg gram baraua se charkha govind singh ke khet tak)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2017-2018 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2017 Work start date : 9/5/2017
Present status : Earthern road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 52/96 Sanction Date : 4/5/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
572789 735037 0 0 0 0 0 736000 0 1307826
Financial Sanction Details
Financial\Administrative Sanction No: 052/03 Financial\Administrative Sanction Date 6/5/2017
Fin. Sanc. Amt. (in Rs) NREGA:1307826 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1308000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.40004.417600
2Dag-beling-Single spade stroke minimum 75mm deep40000.31200
3Stacking without boxing.-Puddle earth, moorum, sand or kankar1854.5109.8203624.1
4Transportation of metal 1854.5123.03228159.135
5Transportation of metal 600165.3399198
6Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.1854.544.782896.15
7Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-300mm dia151535.523032.5
8Construction of granular sub-base (GSB) by naturally occurred material or river born material or by crushed metal or mixture of two or more, to bring the material in appropriate grading mentioned in table 400.1, (I, II or III) of specifications for rural450444.4199980
9Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making220833.273305.6
10Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact1854.538.471212.8
11Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:150504.875720
12SIGN BOARD1800.115800.115
13Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed220852.7116361.6
14contingency1114736114736
Total Activity 1308000
S.NoMaterialQuantityUnit PriceTotal
12043 soil Compaction material220833.273305.6
22048-Construction of gravel ba100350.0735007
32049-Construction of gravel su111
420mm Chips20145029000
540 mm Metal20019038000
6C.B.Bricks50042000
7Cement5029014500
8Centering and Shuttering101001000
9Compaction of Material111
10Compaction of Selected soil129661.16529661.165
11Display board120002000
12Iron rod100606000
13Loosening Machine Rent220852.7116361.6
14Mixture Machine108008000
15pipe151535.523032.5
16Rolling Earth & moorum10110
17Transportation of GSB600165.3399198
18Transportation Of Selected Soi1854.5123.03228159.135
19Transpotation Charges101001000
20अन्‍य कर्य101001000
21गेंती101001000
22पानी टेकर108008000
23मुरम501909500
24रेत108508500
25रोलर1800800
Total Material 736000