The Mahatma Gandhi National Rural Employment Guarantee Act 27-Jun-2024 06:32:17 PM 
Back  
State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: SAGRON
Work Code: 1711003014/WC/22012035120524 (AMRAT SAROVAR NIRMAN KARYA SEMRA BADI MATA KE PAS )
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2023-2024 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2023 Work start date : 28/4/2023
Present status : Non-existent Proposed Status : Construction of Community Water Harvesting Ponds
Tech Sanction Details
Technical Sanction No. : 1764 Sanction Date : 16/4/2023
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Public Contribution scheme2 scheme3 Total
914000 506000 0 0 75000 0 0 581000 0 1495000
Financial Sanction Details
Financial\Administrative Sanction No: 704 Financial\Administrative Sanction Date 27/4/2023
Fin. Sanc. Amt. (in Rs) NREGA:1420000 Public Contribution
75000
Scheme 2
0
Scheme 3
0
Total
1495000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.4496.67.9435703.004
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil3885.35144.07559762.3745
3Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Loose or soft soil283.594.4526776.575
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)34.23947.45135002.79
5Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making3885.3517.4467760.504
6FOR EARTHEN DAM - Puddle filling of good clay including lead upto 50m including mixing watering and kneeding by tamping ramming and laying etc.1265.6118.3623236.5996
7FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Boulders396.9452.89179752.041
8Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.1371.05191.91263118.2055
922cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014537.67379.2203884.464
Total Activity 1495000
S.NoMaterialQuantityUnit PriceTotal
120 MM Gitti51120061200
240 M.M. Gitti22110024200
3Boulder Transportation186.04232.9643339.8784
4CEMENT (BEGS)24039594800
5centring12610012600
6Convergence Amount17500075000
7pitching stone107.081000107080
8Rolling Compaction1852.6417.4432310.0416
9Transportanion of Water 10100010000
10काली मिटटी280130.2536470
11मुरुम परिवहन151.91104.9515942.9545
12रेत 48.61140068054
Total Material 581000