State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: KADHURA
Work Code: 1702001047/LD/22012034312228 (Shantidham- Kadora (Badapura))
Work Category: Anganvany
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/8/2016 Work start date : 20/10/2016
Present status : NEW Proposed Status : Crematorium
Tech Sanction Details
Technical Sanction No. : 552 TS Sanction Date : 28/12/2016
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
SK/SemiSK Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
61000 184000 0 0 0 0 0 184000 0 245000
Financial Sanction Details
Financial\Administrative Sanction No: 113/552 Financial\Administrative Sanction Date 25/1/2017
Fin. Sanc. Amt. (in Rs) NREGA:245000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
245000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.1404.1574
2Dag-beling-Double spade "v" shaped stroke 100mm deep650.532.5
3Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete.4.5504.82271.6
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)0.12809.5280.95
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal)0.91924.21731.78
6Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)2.853047.18684.235
7False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift10.28186.11913.108
8Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:8 (1cement, 8sand)3.952984.511788.775
9Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height1687.6671.7121005.222
1010mm thick cement plaster on fair side of wall in-Cement mortar 1:5 (1cement, 5sand)15.396.21471.86
11Providing corrugated C.I. sheet of class III roofing fixed with galvanised iron J or L hooks bolts and nuts 8mm diameter with bitumen and G.I. limpet washers or with complete excluding the cost of purlins, rafters and trusses.-0.80 mm thick sheet.75.2800.360182.56
12Providing ridges or hips 600mm over all in plain G.I. sheet class III fixed with galvanised iron J or L hooks bolts and nuts 8mm diameter G.I. limpet bitumen washers complete.-0.80 mm thick sheet.6.4528.93384.96
13Cement washing (Portland cement) 3 coats.-White cement13.524.9336.15
14Painting two coats (excluding priming coat) on new steel and other metal surfaces with Aluminium paint, brushing to give an even shade including cleaning the surface of all dirt, dust and other foreign matter.-2 coats150005000
15Field Technical Supervisior Charge-FTSC12600026000
Total Activity 245000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL2.510002500
2AngleRod15407554075
3Brick6600426400
4CEMENT(BEGS)352609100
5Centering and Shuttering9.11301183
6Compaction of Earth Work72520.715007.5
7contengency125002500
8Rolling Compaction61.959.73695.43
9Sand13.0680010448
10sariya5005025000
11steel work2256013500
12Tean Shad1676510855
13Transpotation Charges 2181958195
14बोर्ड115001500
Total Material 184000