Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 04:18:26 AM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: SALAI
Work Code: 1725006043/WC/22012035185864 (pokhar nirman kary badi gochar ke pass salai)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2023-2024 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 27/1/2024 Work start date : 10/3/2024
Present status : Existing Proposed Status : Construction of Community Water Harvesting Ponds
Tech Sanction Details
Technical Sanction No. : 1725006/2023-2024/37054/TS Sanction Date : 7/3/2024
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
421066.97 200564.73 25041.21 318.16 0 0 0 226000 10000 656991.07
Financial Sanction Details
Financial\Administrative Sanction No: 1725006/2023-2024/37054/AS Financial\Administrative Sanction Date 8/3/2024
Fin. Sanc. Amt. (in Rs) NREGA:657303 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
658000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1(I) 1.50 m. to 3.00 m.1683.37511.357190168560219118.41
2(I) 0.5 Km. Lead --1683.37593.3403727630504157126.85
322cm thick dry stone pitching ( without quarry spalls ) with individual stone of 22 cm depth and minimum size 0.014 cum252444.225595238095111944.85
4Loosing of hard soIl such as moorum etc. By ploughing (tractor ect.) the existing ground exceeding 30cm in depth as well as 10 sqm on plan including all running expanses of machine.3999.753.0510006875429712203.24
5Spreading dressing, breaking of clods of ploughed earth upto 20m lead and lift upto 1.5m disposed soil to be leveled and neatly dressed.3999.7585.6886055378461342733
6Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works )14175.754175.75
Total Activity 648000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.017876100017.876
20084-Hire charges of Diesel truck - 9 tonne (without POL)40.405489210084851.5269
30367-Portland Cement0.07775126400497.60768
40368-White cement 0.0003806156265.9472556
50983-Fine sand (zone IV)0.21554641025220.93506
61158-Stone for pitching 15 cm x 22.5 cm75.645034020
71235-Diesel oil109.094820310010909.48203
85001-Mobil oil4.04054892701090.948203
97900-Modular common burnt clay bricks of class designation 7.5244.45.21270.88
107-Worksite facilities/Creche/Drinking water/First ai11000010000
11MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT0.06550032.5
12MR6032-Snowcem/ durocem0.00072662600018.8916
13MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)0.02479018.96
14MR6089-Hire Charges for tractor with ploughing arrangement including running expanses and driver17.99887560010799.325
Total Material 154000