State: MADHYA PRADESH District: KHANDWA Block: BALADI Panchayat: SEMRUDH RAIYAT
Work Code: 1725001035/RC/22012034201370 (AANTRIK MARG SAH NALI NIRMAN KARY PRAKAS KEGAR SE)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 2/8/2013 Work start date : 12/1/2014
Present status : Earthern road Proposed Status : Earthern road
Tech Sanction Details
Technical Sanction No. : 000539/2 Sanction Date : 10/1/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
104000 71000 0 0 0 0 0 71000 0 175000
Financial Sanction Details
Financial\Administrative Sanction No: 0009/2 Financial\Administrative Sanction Date 12/1/2014
Fin. Sanc. Amt. (in Rs) NREGA:175000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
175000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil255.0786.2521999.7875
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)16.22243628.8
3Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead2787.482361.96
4Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m000
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)93177.828600.2
6Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)92478.222303.8
7False work for R.C.C. and P.C.C. work in plinth and foundation180154.227756
8Transportation of metal 18094.3216977.6
9Transportation of metal 8.1161.51308.15
10Transportation of metal 7.65161.51235.475
11Transportation of metal 7.92193.051528.956
12Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.718023.64248
13Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN9057.75193
14Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work2.781.2219.24
15Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed-Hard moorum for Road Work8.197.7791.37
16Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Disintegrated or soft rock (not requiring blasting)180118.821384
17Surface dressing of ground, including removing vegetation, and/ or unequalities not exceeding 15cm deep and disposal of rubbish lead upto 20m And lift upto1.5m-Dense or hard soil.60012.87680
18work charge175487548
Total Activity 175000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL79006300
240 mm Metal87506000
3cement Begs8528023800
4Centering and Shuttering100757500
5mason parday4.53001350
6Rolling Compaction5057.72885
7sand transport Trip330009000
8Transportation of hard moorum15094.3214148
Total Material 71000