S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 480 | 7.04 | 3379.2 |
2 | Labour only for Cement Mortar | 200 | 506.24 | 101248 |
3 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil | 4.03 | 472.39 | 1903.7317 |
4 | Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Hard rock requiring blasting | 288 | 156.79 | 45155.52 |
5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 1200 | 114.56 | 137472 |
6 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 6.97 | 58.68 | 408.9996 |
7 | Labour only for item no. 0404 | 0 | 0 | 0 |
8 | Plum cement concrete 1:2:4 with 75% graded metal of 40mm size and 25% plums of 150mm size. | 7.34 | 618.58 | 4540.3772 |
9 | False work for R.C.C. and P.C.C. work in plinth and foundation | 1 | 1500 | 1500 |
10 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Lime mortar 1:2 (1lime putty, 2sand) | 2 | 5500 | 11000 |
11 | Coursed rubble masonry second sort in plinth and foundation.-In Cement mortar 1:6 (1cement, 6sand) | 14.89 | 469.1 | 6984.899 |
12 | Add for masonry in supper structure above plinth level up to floor two level | 14.75 | 123.32 | 1818.97 |
13 | Half brick masonry in class 25 open bhatta or pajawa burnt brick in super structure including placing of 6mm iron bar at every 3rd layer of brick.-In cement mortar 1:3 | 26.12 | 72.56 | 1895.2672 |
14 | Add to item no.0618 for class 35 T.M. chimney burnt/ ghola bricks. | 195.22 | 15.16 | 2959.5352 |
15 | Steel work in single section including in cutting, hoisting fixing in position in R.S. joists, channels, angles, tee. | 574 | 2.49 | 1429.26 |
16 | Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height | 364 | 14.29 | 5201.56 |
17 | 15mm thick cement plaster on rough side of wall in-Cement mortar 1:6 (1cement, 6sand) | 182.92 | 48.67 | 8902.7164 |
18 | 6mm cement plaster to Ceiling.-In Cement mortar 1:4 (1cement, 4sand) | 12.28 | 38.69 | 475.1132 |
19 | Tiled roofing with Mangalore tiles, including sal, bija, haldu or saj battens of size 50mm X 25mm but excluding ridge and hip tiles. | 20.34 | 176.86 | 3597.3324 |
20 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Loose or soft soil | 22.65 | 148.73 | 3368.7345 |