State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: KATHERI
Work Code: 1713004052/RC/22012034284103 (TS NO. 367 खेत सडक निर्माण मुख्‍यमार्ग से अनंत पटेल के घर तरफ)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 11/4/2015 Work start date : 4/9/2015
Present status : No Road Proposed Status : Bitumen Top
Tech Sanction Details
Technical Sanction No. : 367/52 Sanction Date : 26/6/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
500000 416000 0 0 0 0 0 416000 0 916000
Financial Sanction Details
Financial\Administrative Sanction No: 03/52 Financial\Administrative Sanction Date 2/9/2015
Fin. Sanc. Amt. (in Rs) NREGA:916000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
916000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard115001500
2Site clearance, cutting grass, raking into heaps and removing off the premises44801.77616
3Dag-beling-Single spade stroke minimum 75mm deep21000.3630
4Transportation of metal 2245.03112.41252363.8223
5Transportation of metal 412.02324.45133679.889
6Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-600mm dia13500035000
7Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making2566.7721.555185.555
8Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work321.7487.328087.902
9Collection of puddle earth including stacking at quarry2245.03121.3272322.139
10Collection of hard moorum including stacking at quarry.324.45140.745650.115
11Barbed wire Fixing only61.5324.4519953.675
12contingency12400024000
13Labour difference in case of old SoR25015939750
Total Activity 916000
S.NoMaterialQuantityUnit PriceTotal
1Compaction of Earth Work16.92566.7743378.413
2Compaction of GSB61.5324.4519953.675
3contangency and work charges12500025000
4Display board160006000
5HumePipes13000030000
6soil transportation70.022245.03157197.0006
7transportation of hard muram 1412.02324.45133679.889
Total Material 416000