S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil | 350 | 0.5 | 175 |
2 | Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete. | 58.49 | 537.3 | 31426.677 |
3 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal) | 58.59 | 3067.2 | 179707.248 |
4 | False work for R.C.C. and P.C.C. work in plinth and foundation | 70 | 129 | 9030 |
5 | Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide) | 109 | 6.2 | 675.8 |
6 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 30 Kms. and part there of upto 50 Kms. | 45.45 | 703.1 | 31955.895 |
7 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 1 | 41250 | 41250 |
8 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 87.49 | 87.3 | 7637.877 |
9 | Field Technical Supervisior Charge-FTSC | 1 | 8000 | 8000 |