S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 3000 | 3.6792 | 11037.6 |
2 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 20000 | 1.9161 | 38322 |
3 | Hard/ Dense Soil : | 1647 | 63.7217000607165 | 104949.64 |
4 | Digging of planting pits for plantation work, sizes as per plant specification and plant height : | 125.02 | 48.1632538793793 | 6021.37 |
5 | Providing and filling pits with locally available Firm Yard Manure (FYM) as per planting specification : | 1352 | 28.77 | 38897.04 |
6 | Filling of excavated earth in planting pit in layers not exceeding 20 cm in depth consolidating each deposited layers by ramming watering etc., : | 123.2 | 56.7564935064935 | 6992.4 |
7 | Cost of Planting of Mangifera Indica (Mango Grafted ) of height 60-75 cm at a spacing of not less than 4.5 X 4.5 m with pit size as per plant specification and types : | 1352 | 65 | 87880 |