S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 0 | 1500 | 0 |
2 | Work charge | 1 | 39000 | 39000 |
3 | Dag-beling-Single spade stroke minimum 75mm deep | 3600 | 0.2 | 720 |
4 | Transportation of metal | 3600 | 114.1 | 410760 |
5 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making | 3600 | 21.5 | 77400 |
6 | Site clearance, cutting grass, raking into heaps and removing off the premises | 7200 | 1.6 | 11520 |
7 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. | 3600 | 60.2 | 216720 |
8 | Collection of puddle earth including stacking at quarry | 3600 | 112.8 | 406080 |
9 | 1902 Transportion of metal | 800 | 208.4 | 166720 |