S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 3850 | 1.8 | 6930 |
2 | Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor | 1350 | 27.7 | 37395 |
3 | Collection of soft moorum including stacking at quarry. | 1071 | 311.2 | 333295.2 |
4 | Collection of hard moorum including stacking at quarry. | 315 | 347.52 | 109468.8 |
5 | Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Loose or soft soil. | 3500 | 14 | 49000 |