S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 1350 | 6.05991111111111 | 8180.88 |
2 | (b) C.C. 1:3:6 (1cement, 3sand, 6metal) | 4.73 | 3121.89006342495 | 14766.54 |
3 | (a) Moorum or sand | 349.31 | 22.3741948412585 | 7815.53 |
4 | (a) Puddle earth, sand or kankar | 1012.5 | 15.6518518518519 | 15847.5 |
5 | (X) 5.0 Km. Lead | 349.31 | 148.837880392774 | 51990.56 |
6 | (IV) 2.0 Km. Lead | 1012.5 | 108.564434567901 | 109921.49 |
7 | (d) 600 mm dia. | 15 | 1663.36733333333 | 24950.51 |
8 | (a) For minimun soacked CBR Value of 20 | 236.25 | 399.411005291005 | 94360.85 |
9 | Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making 4% camber and required Grade by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 97% as per table 300.1 and 300.2 of (MORD) - i/c required leads and lifts of materials etc. complete. | 567 | 17.2565432098765 | 9784.46 |
10 | Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor mounted grader or labourers, watering at OMC and compacted by 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7). Complet compaction work as per specifications for rural roads (MORD) clause 303, i/c required leads and lifts of materials etc. complete. | 1012.5 | 18.9345975308642 | 19171.28 |
11 | Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7), as per clause 407 of specifications for rural roads(MORD), i/c required leads and lifts of materials etc. complete. | 621 | 35.12 | 21809.52 |
12 | "Construction of Gravel Surface Course as per clause 402 of "Ministry of Rural Development, Specifications for Rural Roads-August, 2004" by an appropriate combination of natural gravel, river borne material and crushed metal in required proportions confirming to Grading requirements specified in clause 2.2.2.2 or clause 2.2.2.3 (Table 2.3, Material having Nominal Maximum Size 20 mm or 10 mm) of IRC:SP:77-2008, having Liquid Limit less than 40 and Plasticity Index 6-15 and strength of material not less than 20% CBR, including all leads and lifts of material etc. complete. The mixing shall be by Mix-in-Place method over prepared surface, spreading in uniform layers with tractor mounted grader or manually, watering at OMC and compaction by smooth wheeled/vibratory roller of 80 to 100 kN static weight to achieve 100% of MDD as per IS:2720 (Part-7)". | 120 | 467.725666666667 | 56127.08 |
13 | Collection of approved soil having CBR not less then 12, including stacking at quarry. | 349.31 | 192.915261515559 | 67387.23 |
14 | Loosing of hard soIl such as moorum etc. By ploughing (tractor ect.) the existing ground exceeding 30cm in depth as well as 10 sqm on plan including all running expanses of machine. | 1579.5 | 3.60017727128838 | 5686.48 |
15 | Spreading dressing, breaking of clods of ploughed earth upto 20m lead and lift upto 1.5m disposed soil to be leveled and neatly dressed. | 1579.5 | 68.2407027540361 | 107786.19 |
16 | Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works ) | 1 | 3530.01 | 3530.01 |