State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: DULHAR
Work Code: 1725006024/IF/22012034589277 (निजी खेत फलोद्दान रेशमबाई के खेत पर)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2020-2021 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : No
Proposal Date : 14/4/2020 Work start date : 25/7/2020
Present status : Not Exist Proposed Status : Block Plantation - Shelter Belt for Individuals
Tech Sanction Details
Technical Sanction No. : 1725006/2020-2021/301541/TS Sanction Date : 8/8/2020
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
49855.3 21758.55 71.93 267.03 0 0 0 22100 0 71952.81
Financial Sanction Details
Financial\Administrative Sanction No: 1725006/2020-2021/301541/AS Financial\Administrative Sanction Date 8/8/2020
Fin. Sanc. Amt. (in Rs) NREGA:72241 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
72300
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1(a) Dense or hard soil (PT/60/60)58.32159.7367969821679315.85
2(b) Dense or hard soil (PT/45/45)2.16166.412037037037359.45
3Loosing of hard soIl such as moorum etc. By ploughing (tractor ect.) the existing ground exceeding 30cm in depth as well as 10 sqm on plan including all running expanses of machine.112.53.60017777777778405.02
4Spreading dressing, breaking of clods of ploughed earth upto 20m lead and lift upto 1.5m disposed soil to be leveled and neatly dressed.112.573.66897777777788287.76
5Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works )13578.363578.36
6Filling dug pits with manure/compost for dug-pit size 0.60x0.60x0.60 m (using Manure and Excavated earth for filling)13011.9781557.14
7(VIII) Anar plant (layering)13038.1944965.22
8(I) In First Year (only in case of survival more than 85%)100203.398920339.89
9(II) In second Year ((only in case of survival more than 95%)100145.955314595.53
10(III) In third year (only in case of 100% survival)10085.83938583.93
11(I) 0 to 10 km1301.25162.5
12Deduct if filling the dug pit in any year except first year30390
Total Activity 72300
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.018858.85
20367-Portland Cement0.02895511159.2679
30368-White cement 0.0004157446.2976
40983-Fine sand (zone IV)0.0471076.2550.58375
57900-Modular common burnt clay bricks of class designation 7.5244.44.131009.372
6MR11635-Hire charges for tractor with trolley (including all running expanses and POL)0.16251000162.5
7MR11659-Phorate 10% CG7.5105787.5
8MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT0.06552534.125
9MR6032-Snowcem/ durocem0.00072778919.4523
10MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)0.02468216.368
11MR6089-Hire Charges for tractor with ploughing arrangement including running expanses and driver0.5063708358.4604
12MR6103-Urea605.92355.2
13MR6105-Single super phosphate (SSP) (Danedar)1606.351016
14MR6106-Muriate of potash6018.91134
15MR6107-Farm yard manure31501.23780
16MR6123-Anar Plant (layering)130303900
Total Material 12800