State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: JAURIKOTWAL
Work Code: 1702001083/RC/22012034205331 (cc road phoop main road to ram murti house)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : No
Proposal Date : 26/1/2014 Work start date : 18/2/2014
Present status : No Road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 185/2013-14 Sanction Date : 10/2/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
111600 74400 0 0 334500 0 0 409000 0 520500
Financial Sanction Details
Financial\Administrative Sanction No: 5/185 Financial\Administrative Sanction Date 13/2/2014
Fin. Sanc. Amt. (in Rs) NREGA:186000 Panchparmeshwar
334500
Scheme 2
0
Scheme 3
0
Total
521000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard125002500
2Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete.83.85504.842327.48
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)95.852928.1280658.385
4False work for R.C.C. and P.C.C. work in plinth and foundation175.05127.322283.865
5Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 83.856503.1
6Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 95.85323067.2
7Transportation of 20 MM metal81.47708.257697.054
8Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.17050070500
9Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work228.681.218562.32
10contingency12238922389
Total Activity 521000
S.NoMaterialQuantityUnit PriceTotal
1CEMENT(BEGS)28626074360
2Convergence Amount1334500334500
Total Material 409000