State: MADHYA PRADESH District: SHAJAPUR Block: MOMAN BADODIYA Panchayat: PACHOR
Work Code: 1719006081/RC/22012034471314 (c.c.road )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2019-2020 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 1/4/2019 Work start date : 25/7/2019
Present status : No Road Proposed Status : Constr of Cement Concrete Roads for Comm
Tech Sanction Details
Technical Sanction No. : 49/ 0 1 Sanction Date : 16/7/2019
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
65000 0 0 0 421000 0 0 421000 0 486000
Financial Sanction Details
Financial\Administrative Sanction No: 81/03 Financial\Administrative Sanction Date 22/7/2019
Fin. Sanc. Amt. (in Rs) NREGA:65000.0000000001 Panchparmeshwar
421000
Scheme 2
0
Scheme 3
0
Total
486000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Dag-beling-Double spade "v" shaped stroke 100mm deep5650.8452
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)63.852562.8163634.78
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)63.853175.9202781.215
4Labour only for item no. 0413 (for any proportion of cement concrete)169.52.7457.65
5Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used169.5508475
6False work for R.C.C. and P.C.C. work in plinth and foundation169.5118.820136.6
7Transportation of metal 11347053110
8Loading of metal in truck, dumper etc.63.8559.53799.075
9Unloading of metal in truck, dumper etc.127.699.21174.748
10Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.32050.2916092.8
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work800018000
12Field Technical Supervisior Charge-FTSC178507850
Total Activity 486000
S.NoMaterialQuantityUnit PriceTotal
140 M.M. METAL100
2Convergence Amount1421000421000
Total Material 421000