S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 2150 | 3.4 | 7310 |
2 | Contingency | 1 | 13955.4034 | 13955.4034 |
3 | Dag-beling-Single spade stroke minimum 75mm deep | 770 | 0.4 | 308 |
4 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 3.84 | 121.5 | 466.56 |
5 | Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering. | 18 | 676.9 | 12184.2 |
6 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 1.58 | 1743.2 | 2754.256 |
7 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal) | 2.23 | 1514.4 | 3377.112 |
8 | Providing and laying damp proof course 50mm thick with C.C.1:2:4 with 20mm size graded stone aggregate. including curing. | 144 | 142.9 | 20577.6 |
9 | False work for R.C.C. and P.C.C. work in plinth and foundation | 10.56 | 116.4 | 1229.184 |
10 | Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level. | 177.3 | 784.87 | 139157.451 |
11 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:8 (1cement, 8sand) | 10.54 | 1278.3 | 13473.282 |
12 | Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height | 638.4 | 57.3 | 36580.32 |
13 | Pointing on CR masonry with cement mortar 1:4(1cement, 4sand)-Flush pointing | 302 | 48.6 | 14677.2 |
14 | Providing corrugated C.I. sheet of class III roofing fixed with galvanised iron J or L hooks bolts and nuts 8mm diameter with bitumen and G.I. limpet washers or with complete excluding the cost of purlins, rafters and trusses.-0.80 mm thick sheet. | 19.2 | 621.7 | 11936.64 |
15 | Second class brick flooring laid dry grouted with C.M. 1:6 i/c finishing the joints flush. | 14.08 | 226.5 | 3189.12 |
16 | Transportation of 20 MM metal | 6.12 | 345.45 | 2114.154 |
17 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms. | 21.46 | 198.3 | 4255.518 |
18 | Transportation of sand | 6 | 162.81 | 976.86 |
19 | Transportation rates for Masonry stone. | 177.34 | 310.1 | 54993.134 |
20 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 343.76 | 101.61 | 34929.4536 |
21 | Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing. | 259.5 | 30 | 7785 |
22 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 621 | 67.8 | 42103.8 |
23 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 98.93 | 73.8 | 7301.034 |
24 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Hard moorum | 82.32 | 84.9 | 6988.968 |
25 | Collection of hard moorum including stacking at quarry. | 259.5 | 109.3 | 28363.35 |
26 | contingency | 1 | 24000 | 24000 |
27 | TRANSPOTATION OF CEMENT | 1 | 1586 | 1586 |
28 | All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala construction, earthing up etc.e with securty for first year per 675 plants. | 286 | 146 | 41756 |
29 | All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala preparation, earthing up etc. with securty for second year per 675 plants. | 272 | 146 | 39712 |
30 | All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala preparation, earthing up etc. with securty for thirdyear per 900 plants. | 272 | 146 | 39712 |
31 | Supply of vermi compost | 75 | 6 | 450 |
32 | Supply of singal super phosphate (SSP) | 34.09 | 4 | 136.36 |
33 | Supply of urea. | 34.09 | 6 | 204.54 |
34 | Supply of Neem cake | 15 | 20 | 300 |
35 | Supply of Themate, phorate 10 G pesticites | 2.04 | 100 | 204 |
36 | Supply of foresty or horticulture Plant cost graffted 2 to 3 feet . height | 75 | 26 | 1950 |
37 | Supply of Plant protection pesticides per plant, a-foresty plant, b- fruit plant. | 75 | 10 | 750 |
38 | Rent for water Tankar of capacity 5000 Litre including tractor, diesel, driver etc. complete for one day. | 20 | 700 | 14000 |
39 | Consumption of Diesel or monthly electic bill for Irrgation of plantation area per hect. | 1 | 10000 | 10000 |