State: MADHYA PRADESH District: DAMOH Block: JABERA Panchayat: KORATA
Work Code: 1711006051/WC/22012034389901 (stap dam nirman/bhokai nala par/korata)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 1/4/2018 Work start date : 15/5/2018
Present status : Non-existent Proposed Status : Constr of Earthen Check Dam for Community
Tech Sanction Details
Technical Sanction No. : ts-154/051 Sanction Date : 7/5/2018
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
265000 1213000 0 0 0 0 0 1213000 0 1478000
Financial Sanction Details
Financial\Administrative Sanction No: as-1796 Financial\Administrative Sanction Date 11/5/2018
Fin. Sanc. Amt. (in Rs) NREGA:1478000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1478000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard120002000
2Site clearance, cutting grass, raking into heaps and removing off the premises1001.6160
3Contingency15.45100015450
4Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil154.696.214872.52
5Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Hard moorum35.66117.84200.748
6Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)185.93474.1645835.19
7Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)46.92603.5122104.15
8Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)2.74071.310992.51
9False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift365.8223.881866.04
10Labour only for random/ uncoursed rubble masonry in any. Mortar for item no.0506 excluding labour for preparation of mortar.189.7688.416774.784
11Coursed rubble masonry second sort in plinth and foundation.-In Lime mortar 1:3 (1lime putty, 3sand)154.922492.2386091.624
12Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height54068.236828
13Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars495.854.426971.52
14TRANSPORTATION OF MATERIAL69100069000
15Pointing on CR masonry with cement mortar 1:4(1cement, 4sand)-Flush pointing84.989.97632.51
16Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Disintegrated or soft rock (not requiring blasting)139.05262.236458.91
Total Activity 1478000
S.NoMaterialQuantityUnit PriceTotal
120 MM BT matel5085042500
240 mm size HG metal5050025000
3Cement450620279000
4centring10010010000
5Contengency150005000
6Display board150005000
7Messonary Stone225520117000
8Mixher Machine20100020000
9PhotoCopy & Stationary1503450
10Photograph1050500
11Shuttering10450045000
12Transpotation Charges1206000206000
13पानी टेकर5050025000
14रेत6585055250
15लोहा650058377000
Total Material 1213000