S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 21500 | 1.02 | 21930 |
2 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-oose or soft soil for Well Work | 2210 | 86.25 | 190612.5 |
3 | 1902 transportion of metal | 4 | 23803.01 | 95212.04 |
4 | work charge | 120 | 100 | 12000 |
5 | Transplanting plant and preparation of thala for 45x45x45cm. pits. Mandays per hundered | 454.41 | 262.8 | 119418.948 |
6 | Supply of farm yard mannure (FYM) to the plantation site. | 2200 | 1.5 | 3300 |
7 | Supply of vermi compost | 2200 | 5 | 11000 |
8 | Supply of singal super phosphate (SSP) | 2200 | 6.6 | 14520 |
9 | Transport of plants from nursury to plantation site upto 40 km. including loading and unloading | 2200 | 4 | 8800 |
10 | Supply of Bone meal | 2100 | 10 | 21000 |