Work Code: 1713007066/RC/22012034218447 (SUDUR GRAM SAMPARK KHET SADAK PIPAL KE PED SE LOTH)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 11/2/2014 Work start date : 4/3/2014
Present status : No Road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 2369 Sanction Date : 3/3/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
689800 459800 0 0 288400 0 0 749000 0 1438000
Financial Sanction Details
Financial\Administrative Sanction No: 066/27 Financial\Administrative Sanction Date 4/3/2014
Fin. Sanc. Amt. (in Rs) NREGA:1438000 Panchparmeshwar
0
Scheme 2
0
Scheme 3
0
Total
1438000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.72001.611520
2Filling foundation and around masonry work with moorum I/c ramming layers and watering.25.98145.43777.492
3Labour only for item no.040260035.821480
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)4.592343.810758.042
5Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)0.333400.41122.132
6Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:6 (1cement, 6sand)16.2185530051
7Pointing on CR masonry with cement mortar 1:4(1cement, 4sand)-Flush pointing30.39591793.01
8Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 499813.567473
9Transportation of metal 824.25102.6984642.2325
10Transportation of metal 1620139.86226573.2
11Transportation rates for Masonry stone.120107.2620107.26
12Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.150223.5633534
13Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.450295.56133002
14Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN60032.819680
15Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-450mm dia22.5574.2512920.625
16Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia.22.5347678210
17Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making329721.570885.5
18Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor16202337260
19Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work499881.2405837.6
20Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil35.7988.33160.257
21Collection of hard moorum including stacking at quarry.600130.878480
22Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 With Reinforced cement concrete (i) 5th Kilometre Stone (precast) (ii) Ordinary Kilometer Stone (Precast) (iii) 200 m stone (precast)8437.53500
23SIGN BOARD135003500
24contingency141888.6741888.67
25Labour difference in case of old SoR25014636500
Total Activity 1438000
S.NoMaterialQuantityUnit PriceTotal
12043 soil Compaction material14800048000
2cement bag000
3Compaction of Selected soil12300023000
4Convergence Amount1288482288482
5PhotoCopy & Stationary160006000
6Transportanion of hard Muram1133000133000
7Transportanion of Soft Muram12200022000
8Transportation of embankment s1192000192000
9Transportation of Water13650036500
Total Material 749000