S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2500 | 2500 |
2 | Contingency | 1 | 5734 | 5734 |
3 | Work charge | 1 | 8350 | 8350 |
4 | Dag-beling-Single spade stroke minimum 75mm deep | 180 | 0.5 | 90 |
5 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 82.8 | 21.9 | 1813.32 |
6 | Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete. | 40.5 | 787.6 | 31897.8 |
7 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 32.4 | 3076.3 | 99672.12 |
8 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 34.2 | 2429.6 | 83092.32 |
9 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 32.4 | 80.7 | 2614.68 |
10 | False work for R.C.C. and P.C.C. work in plinth and foundation | 81.3 | 171.6 | 13951.08 |
11 | Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide) | 87 | 6.2 | 539.4 |
12 | Transportation of metal | 11.07 | 108.99 | 1206.5193 |
13 | Transportation of metal | 30.78 | 121.1 | 3727.458 |
14 | Transportation of metal | 27.5 | 146.9 | 4039.75 |
15 | Transportation of 20 MM metal | 0 | 0 | 0 |
16 | Transportation of sand | 69.82 | 279.81 | 19536.3342 |
17 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 12.39 | 132.21 | 1638.0819 |
18 | Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.7 | 21.6 | 21.2 | 457.92 |
19 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work | 82.8 | 81.2 | 6723.36 |
20 | Collection of hard moorum including stacking at quarry. | 21.6 | 170.22 | 3676.752 |