State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: MANGOLA
Work Code: 1711003017/WC/22012034962217 (AMRIT SAROVAR NIRMAN KARY MANGOLA )
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2022-2023 Execution Level : GP
Execution Agency : Rural Engineering Services(04004) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2022 Work start date : 27/4/2022
Present status : Non-existent Proposed Status : Construction of Community Water Harvesting Ponds
Tech Sanction Details
Technical Sanction No. : 486/ts Sanction Date : 14/4/2022
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Public Contribution scheme2 scheme3 Total
2754000 1805000 0 0 2000 0 0 1807000 0 4561000
Financial Sanction Details
Financial\Administrative Sanction No: 625/as Financial\Administrative Sanction Date 26/4/2022
Fin. Sanc. Amt. (in Rs) NREGA:4559000 Public Contribution
2000
Scheme 2
0
Scheme 3
0
Total
4561000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.7397.57.0251930.45
2Contingency1643738643738
3Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Loose or soft soil776.694.4573349.87
4Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil406.05169.8368959.4715
5Filling foundation and around masonry work with moorum I/c ramming layers and watering.180277.6949984.2
6Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)123.633947.45488023.2435
7Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)41.73202.63133549.671
8False work for R.C.C. and P.C.C. work in plinth and foundation381.6166.0863376.128
9TRANSPORTATION OF MATERIAL1123000123000
10Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making7730.5517.44134820.792
11FOR EARTHEN DAM - Puddle filling of good clay including lead upto 50m including mixing watering and kneeding by tamping ramming and laying etc.798259.34206953.32
12FOR EARTHEN DAM - Construction of rock toe in earthen embankments including laying and hand packing, dressing, wedging and finishing over surface with.-Boulders517.33598.84309797.8972
13Earth work for well excavation including disposal of excavated soil lead upto 20 m. & lift upto 1.5 m., disposed soil to be levelled and neatly dressed. Loose or soft soil. Lift from 1.5 m. to 2.00 m.960120.79115958.4
14Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil637.24159.75101799.09
15Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum13431.1120.791622342.569
1622cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.0141729.26215.94373416.4044
Total Activity 4561000
S.NoMaterialQuantityUnit PriceTotal
120 MM Gitti1601200192000
240 M.M. Gitti150800120000
3CEMENT (BEGS)880350308000
4Centring & Shuttering13010030100
5Convergence Amount120002000
6Messonary Stone2501000250000
7mooram280226.4563406
8Pitching stones3329.3273.89246003.4548
9Rolling Compaction773216.28125876.96
10Transportation charges1120000120000
11Transportation charges of mate000
12Water Transportation40200080000
13काली मिटटी1885.6742.2279612.9874
14रेत 1901000190000
Total Material 1807000