The Mahatma Gandhi National Rural Employment Guarantee Act 28-Jun-2024 07:20:33 PM 
Back  
State: MADHYA PRADESH District: DHAR Block: MANAWAR Panchayat: Udiyapur
Work Code: 1722011061/WC/22012034685852 (CTRA - रूफ वाटर हार्वेस्तिंग कार्य पंचायत भवन उदियापुर)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2021-2022 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2021 Work start date : 29/4/2021
Present status : Non-existent Proposed Status : Roof top rain wat. har. str. in gov/panchayat bldg
Tech Sanction Details
Technical Sanction No. : 1722011/2021-2022/190291/TS Sanction Date : 30/4/2021
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
8117.64 12203.53 493.63 727.03 0 0 0 13500 0 21541.83
Financial Sanction Details
Financial\Administrative Sanction No: 1722011/2021-2022/190291/AS Financial\Administrative Sanction Date 30/4/2021
Fin. Sanc. Amt. (in Rs) NREGA:21542 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
21600
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1(b) C.C. 1:3:6 (1cement, 3sand, 6metal)0.042853.25114.13
2(c) CC 1:2:4 (1 cement, 2 sand, 4 graded stone aggregate 20mm nominal size)0.044769.5190.78
3(b) In cement mortar 1:47.5530.2946666666673977.21
4(d) Cement mortar 1:6 (1cement, 6sand)15139.8466666666672097.7
5Providing and fixing on wall face unplasticised Rigid PVC Rain water pipes conforming to IS : 13592 Type A including jointing with seal ring conforming to IS : 5382 leaving 10 mm gap for thermal expansion. (ii) 110 mm diameter (minimum wall thickness 2.2mm)20231.10054622.01
6(c) Hard moorum16.75176.5874626865672957.84
7Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.13.5163.5674074074072208.16
8Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point.6.75228.1214814814811539.82
9Collection of River Borne Material (RBM) (any mixture of sand and graval ) i/c boxing and all leads and lifts up to loading point at quarry.4.5185.375555555556834.19
Total Activity 18600
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.029388525.9305
20297-Stone Aggregate(single size): 10 mm nominal size0.00796304.977
30367-Portland Cement0.15445511850.8984
40983-Fine sand (zone IV)0.50661076.25545.22825
51004-Average rate of mild steel round bars for reinforcements0.05255192272.58
610-Miscellaneous /Contingencies charges130003000
77900-Modular common burnt clay bricks of class designation 7.5412.54.131703.625
8MR11640-uPVC Pipe (Working Pressure 4kg/cm square) single socketed pipe 110mm dia201603200
9MR11641-uPVC Pipe (Working Pressure 4kg/cm square) rubber (seal) ring 100mm dia3.33332583.3325
10MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT0.023452512.285
11MR6007-Hier Charges for Centering0.03680028.8
12MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)0.032868222.3696
Total Material 9800