Work Code: 1703004041/RC/22012034342725 (SUDUR SAMPARK SADAK NIRMAN P.M.SADAK SE AADAMPUR NADI KI OR)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2017-2018 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2017 Work start date : 29/6/2017
Present status : Earthern road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 154/41 Sanction Date : 10/5/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
580790 633195 0 0 0 0 0 634000 0 1213985
Financial Sanction Details
Financial\Administrative Sanction No: 09/41 Financial\Administrative Sanction Date 5/6/2017
Fin. Sanc. Amt. (in Rs) NREGA:1213980 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1214000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises000
2Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil15.6276.91201.178
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)1.9725044932.88
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2.5:5 (1cement, 2.5 sand, 5metal)16.852854.748101.695
5False work for R.C.C. and P.C.C. work in plinth and foundation50.37147.87444.686
6Double levelling for transfer of bench marks.-Upto15 m interval1954954
7Transportation of metal 2886.2572.36208849.05
8Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.11349013490
9Providing and filling in foundation trenches and at the back of abutments, wing walls etc. and below pipe bed in layers not exceeding 15cm thick including watering and compacting including all lead and lifts.-Selected granular material in filling.1.81016.51829.7
10Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-600mm dia151535.523032.5
11Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-1000 mm dia.63887.623325.6
12Construction of granular sub-base (GSB) by naturally occurred material or river born material or by crushed metal or mixture of two or more, to bring the material in appropriate grading mentioned in table 400.1, (I, II or III) of specifications for rural525576.9302872.5
13Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making126033.241832
14Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact2886.2538.4110832
15Construction of hard shoulder as per clause 407 of specifications for rural roads (MORD), with soil having CBR value not less than 12, inclusive of all leads and lifts, providing 4-5% camber by tractor mounted grader or labourers, watering at OMC and comp320268.485888
16Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:150504.875720
17Site clearance, cutting grass, raking into heaps and removing off the premises90001.816200
18SIGN BOARD15933.85933.8
19Lossening of hard soil by ploughing the existing gound4146.252.711194.875
20Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed4146.2550207312.5
21contingency119781.0319781.03
222507. KM Stone (A) With Rainforced CC (ii) Ordinary KM Stone211352270
232507. KM Stone (A) With Rainforced CC (ii) 200 M Stone33341002
Total Activity 1214000
S.NoMaterialQuantityUnit PriceTotal
120 MM Graded Metal16.251344.721851.375
22043 soil Compaction material126033.241832
32048-Construction of gravel ba525350.07183786.75
42049-Construction of gravel su150277.9741695.5
5BGSY SIGN BOARD15938.85938.8
6Cement9030027000
7Centering and Shuttering50.3762.53148.125
8Compaction of Material2886.2538.4110832
9contangency and work charges1302.93302.93
10hume pipe151535.523032.5
11Kilometre Stone (200 M)33341002
12Kilometre Stone (ordinary)211352270
13Loosening Machine Rent4146.252.711194.875
14pf RCC hume pipe 100063887.923327.4
15signs semi providing 600mm x 4122222222
16Transportanion of hard Muram320130.7741846.4
17Transportation charges2886.2529.4384942.3375
18रेत8.28506970
Total Material 634000