State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: SAGRON
Work Code: 1711003/WC/22012035079602 (Const. of Stopdam Sagron)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2023-2024 Execution Level : BP
Execution Agency : Rural Engineering Services(04004) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : No
Proposal Date : 24/4/2023 Work start date : 8/6/2023
Present status : Non-existent Proposed Status : Constr of Masonry/CC Anicut for Community
Tech Sanction Details
Technical Sanction No. : 280/23 Sanction Date : 18/5/2023
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
1035000 2417000 0 0 0 0 0 2417000 0 3452000
Financial Sanction Details
Financial\Administrative Sanction No: 1777/23 Financial\Administrative Sanction Date 2/6/2023
Fin. Sanc. Amt. (in Rs) NREGA:3452000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
3452000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard136823682
2Contingency1116725116725
3Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Disintegrated or soft rock (not requiring blasting)166335.8755754.42
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)186.423588.96669053.9232
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)55.473202.63177649.8861
6Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)218.355348.121167762.002
7False work for R.C.C. and P.C.C. work in plinth and foundation464174.2180833.44
8Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height399.22102.740999.894
9Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars89587.1778017.15
10Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.1276780276780
11Providing and filling in foundation trenches and at the back of abutments, wing walls etc. and below pipe bed in layers not exceeding 15cm thick including watering and compacting including all lead and lifts.-Selected granular material in filling.238.79647.42154597.4218
12Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti2965.37212.4629844.588
Total Activity 3452000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL195.61050205380
240 M.M. METAL215.8950205010
3Cement2718340924120
4Contangancy14900049000
5False Work440138.5160944.4
6mooram240.78406.7197927.6338
7Sand210.352250473287.5
8sign board136823682
9steel375102.738512.5
10steel work81579.2764605.05
11Transporation of Sand210.35585.71123204.0985
12Transportation of metal411.4414.75170628.15
Total Material 2417000