S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 600 | 7.60931666666667 | 4565.59 |
2 | Single spade stroke minimum 75mm deep | 600 | 0.438283333333333 | 262.97 |
3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 200 | 67.0074 | 13401.48 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 20mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work ( if 20 mm metal is used in place of 40mm metal in item number 04.13 & 04.15)
(a) C.C. 1:2:4 (1cement, 2sand, 4metal) | 22.5 | 4408.24577777778 | 99185.53 |
5 | Filling foundation or under floor with 40mm gauge graded metal and moorum including
ramming in layers and watering. | 64.8 | 1444.41157407407 | 93597.87 |
6 | (f) In Cement mortar 1:8 (1cement, 8sand) | 162 | 2829.14179012346 | 458320.97 |
7 | (a) Flush pointing | 360 | 121.432305555556 | 43715.63 |
8 | (b) Dense or hard soil | 432 | 169.853078703704 | 73376.53 |
9 | Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works ) | 1 | 4175.75 | 4175.75 |