Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Sep-2024 11:10:02 PM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: ROHNAI
Work Code: 1725006040/WC/22012035033183 (पोखर तालाब निर्माण कार्य राजेंद्र के खेत पास )
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2022-2023 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 16/8/2022 Work start date : 5/1/2023
Present status : Non-existent Proposed Status : Construction of Mini Percolation Tank for Comm
Tech Sanction Details
Technical Sanction No. : 1725006/2022-2023/2126/TS Sanction Date : 5/1/2023
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
580206.49 350067.75 35933.31 15900.43 0 0 0 402000 0 982107.98
Financial Sanction Details
Financial\Administrative Sanction No: 1725006/2022-2023/2126/AS Financial\Administrative Sanction Date 5/1/2023
Fin. Sanc. Amt. (in Rs) NREGA:982108 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
983000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1(X) 5.0 Km. Lead1404164.562015669516231045.07
2(XV) 10 Km. Lead198233.28681818181846190.79
3Hearting, casing/cut off filling soil etc. At optimum moisture content to achieve maximum dry density by mechanical sheep foot roller/ vibratory compacters including watering, required leads and lifts and material etc. complete.140421.788561253561330591.14
4Site clearance, cutting grass, raking into heaps and removing off the premises64002.818912518041.04
5b (iii) Dense or hard soil for Tank Work1425.6144.075205393.32
6c (iii) Hard moorum for Tank Work1046.4191.907903287462200812.43
7b (i) Hard rock requiring blasting for Tank Work54643.64074074074134756.6
8Collection of puddle earth including stacking at quarry198194.55888888888938522.66
922cm thick dry stone pitching ( without quarry spalls ) with individual stone of 22 cm depth and minimum size 0.014 cum320430.39440625137726.21
10Loosing of hard soIl such as moorum etc. By ploughing (tractor ect.) the existing ground exceeding 30cm in depth as well as 10 sqm on plan including all running expanses of machine.2403.60016666666667864.04
11Spreading dressing, breaking of clods of ploughed earth upto 20m lead and lift upto 1.5m disposed soil to be leveled and neatly dressed.24079.097166666666718983.32
12Provision for Mate4039215680
Total Activity 979000
S.NoMaterialQuantityUnit PriceTotal
10038-Tractor with ripper attachment1.75525204422.6
20054-Vibratory roller 8 to 10 tonne10.03868508532.81
30057-Water Tanker 5 to 6 KL Capacity28.081203369.6
40084-Hire charges of Diesel truck - 9 tonne (without POL)57.401481222100120543.110562
50325-Blasting powder21.22252.491113.94278
60326-Blasting fuse (fuse wire)21.628604.8
71158-Stone for pitching 15 cm x 22.5 cm9645043200
81235-Diesel oil708.7790252110070877.902521
93-Display Board / CIB135003500
105001-Mobil oil25.10374742706778.011798
11MR6039-Water1404000.057020
12MR6089-Hire Charges for tractor with ploughing arrangement including running expanses and driver1.08708764.64
Total Material 271000