Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 05:09:30 PM 
Back  
State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: SIGON
Work Code: 1711003050/WC/22012035011259 (GRAVEIN STRACTURE NIRMAN KARDARYAV KE KHAT KE PASS )
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2022-2023 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 2/10/2022 Work start date : 12/11/2022
Present status : Non-existent Proposed Status : Repair & Maint of gabion Spur for Comm
Tech Sanction Details
Technical Sanction No. : 1711003/2023-2024/69179/TS Sanction Date : 26/6/2023
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
567656.54 279656.78 844.15 4687.11 0 0 0 286000 0 852844.58
Financial Sanction Details
Financial\Administrative Sanction No: 1711003/2023-2024/69179/AS Financial\Administrative Sanction Date 26/6/2023
Fin. Sanc. Amt. (in Rs) NREGA:852844 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
853000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1(II) Lead upto 150 meters157.29684.283897874071813257.52
2Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m262567.007420952381175894.48
3(a) C.C. 1:2:4 (1cement, 2sand, 4metal)1.544237.922077922086526.4
4Steel work in single section including in cutting, hoisting fixing in position in R.S. joists, channels, angles, tee.960102.00919791666797928.83
5(c) Masonry stones, pitching stones or boulders950.150.570329439006448046.87
6(XV) 10 Km. Lead337264.82465875370989245.91
7(XX) 20 Km. Lead136.416426.03668191414558118.22
8Labour only for boulder soling hand packed excluding consolidation.142.944215.82773673606430851.28
9(b) Dense or hard soil62.784169.85314729867510664.06
10Collection of quarried stone or rubble. Maximum size 0.014 cum.950.1337.135501526155320312.44
Total Activity 851000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.1541000154
20084-Hire charges of Diesel truck - 9 tonne (without POL)26.41329424210055467.917904
30297-Stone Aggregate(single size): 10 mm nominal size0.1694650110.11
40367-Portland Cement0.508264003252.48
50983-Fine sand (zone IV)0.6931025710.325
61007-Structural steel such as tees, angles, channels and R.S. joists 10.0709434812081776.060408
71235-Diesel oil478.9848524510047898.485245
83-Display Board / CIB120002000
95001-Mobil oil17.057386362704605.4943172
10MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT0.8008500400.4
11MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)0.3388790267.652
Total Material 197000