Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Jun-2024 09:32:38 PM 
Back  
State: MADHYA PRADESH District: SHAJAPUR Block: MOMAN BADODIYA Panchayat: SIMROL (SHU)
Work Code: 1719006063/RC/22012034188689 (cc road pp manrega simrol shu babulal to kailash)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 20/4/2013 Work start date : 30/9/2013
Present status : No Road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 63/02 Sanction Date : 25/6/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
103000 67000 0 0 326000 0 0 393000 0 496000
Financial Sanction Details
Financial\Administrative Sanction No: 63/02 Financial\Administrative Sanction Date 27/6/2013
Fin. Sanc. Amt. (in Rs) NREGA:170000 Panchparmeshwar
326000
Scheme 2
0
Scheme 3
0
Total
496000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)129.182442.8315560.904
2Labour only for item no. 0413 (for any proportion of cement concrete)129.18392.250664.396
3Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used129.18132.117064.678
4False work for R.C.C. and P.C.C. work in plinth and foundation160.33153.124546.523
5Deduct for concrete unvibrated in item no. 0425103.0715616078.92
6Transportation of metal 122.3140.144909.5234
7Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms.113.68166.418916.352
8Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.58.13149.768705.5488
9Loading of metal in truck, dumper etc.122.3126.283214.3068
10Unloading of metal in truck, dumper etc.122.3113.141607.1534
11Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.122.31415014.71
12Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work141.5481.211493.048
13Collection of soft moorum including stacking at quarry.122.31112.813796.568
14contingency139593959
Total Activity 496000
S.NoMaterialQuantityUnit PriceTotal
120 MM B.T.METAL113.6880090944
2CEMENT(BEGS)714270192780
3Centering and Shuttering160.337512024.75
4contangency and work charges139593959
5Mason (semi skilled)182003600
6sand cum58.1370040691
7Transportanion of hard Muram122.3140.144909.5234
8Transportanion of sand58.13149.768705.5488
9transpotation of matel113.68166.418916.352
10Vibrator (Per Day)1890016200
Total Material 393000