S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil | 3.17925 | 76.9 | 244.484325 |
2 | Collection of hard metal other then black trap basalt and granite for road works (without blasting) including stacking as per MOST 1995, clause 400.2.5-Grading - 1 (Size ranging from 90 mm to 45 mm) | 0.79481 | 160.5 | 127.567005 |
3 | Collection of hard metal other then black trap basalt and granite for building work (without blasting) .-40 mm nominal size | 1.81217 | 375 | 679.56375 |
4 | Transportation of sand | 2.5969 | 394.95 | 1025.645655 |
5 | Labour only for boulder soling hand packed excluding consolidation. | 0.7948 | 114.5 | 91.0046 |
6 | Labour only for spreading, hand packing, and levelling to gradient and required camber as per MOST 2004 clause 404.3.3 of metal, grade-1 As per MOST 2004 clause 400.2.5 including dressing. | 1.8121 | 44.7 | 81.00087 |
7 | contingency | 3700 | 1 | 3700 |