S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | 22cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014 | 115.5 | 260.4 | 30076.2 |
2 | Labour only-For item no.1321 | 2050.13 | 10.7 | 21936.391 |
3 | Stage-5 Recharging structure 3x3x3 mt. for Dugwell | 1 | 13643.74 | 13643.74 |
4 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. | 4446.75 | 50 | 222337.5 |
5 | Earth work in rough excavation,filling excavated earth into depressions on banking as directed ,top surface to be levelled and neatly dressed.-Hard moorum | 4446.75 | 2.7 | 12006.225 |