Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Jun-2024 06:19:08 PM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: BALADI Panchayat: MALUD
Work Code: 1725001028/IF/22012034422727 (KHET TALAB NIRMAN KARY ANGURSING GANPAT)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2018 Work start date : 7/7/2018
Present status : Existing Proposed Status : Construction of Farm Ponds for Individuals
Tech Sanction Details
Technical Sanction No. : 160/2018 Sanction Date : 5/6/2018
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
180000 120000 0 0 0 0 0 120000 0 300000
Financial Sanction Details
Financial\Administrative Sanction No: 0006/2018 Financial\Administrative Sanction Date 5/7/2018
Fin. Sanc. Amt. (in Rs) NREGA:300000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
300000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
122cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014115.5260.430076.2
2Labour only-For item no.13212050.1310.721936.391
3Stage-5 Recharging structure 3x3x3 mt. for Dugwell113643.7413643.74
4Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.4446.7550222337.5
5Earth work in rough excavation,filling excavated earth into depressions on banking as directed ,top surface to be levelled and neatly dressed.-Hard moorum4446.752.712006.225
Total Activity 300000
S.NoMaterialQuantityUnit PriceTotal
1Convergence Amount12049420494
2Display board130003000
3Plants9380074400
4Transportation charges9722521825
Total Material 120000