State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: GOARKALAN
Work Code: 1702001025/FP/22012034369002 (RCC Nali Nirman Pramod Singh ke Dwar Se Govt. Primary School Ke Peeche Ki Or, Goarkala)
Work Category: Other Works
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2020-2021 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 2/10/2020 Work start date : 8/1/2021
Present status : Weak Embankment Proposed Status : Constr of Flood/ Diversion Channel for Community
Tech Sanction Details
Technical Sanction No. : 4145 TS Sanction Date : 5/1/2021
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost 15th Finance Commission scheme2 scheme3 Total
101000 0 0 0 447000 0 0 447000 0 548000
Financial Sanction Details
Financial\Administrative Sanction No: 01/as Financial\Administrative Sanction Date 5/1/2021
Fin. Sanc. Amt. (in Rs) NREGA:101000 15th Finance Commission
447000
Scheme 2
0
Scheme 3
0
Total
548000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil173.2576.913322.925
2Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete.15.75638.810061.1
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)15.752414.738031.525
4Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1.5:3 (1cement, 1.5sand, 3graded stone aggregate 20 mm nominal size)57.383760.3215766.014
5False work for R.C.C. and P.C.C. work in plinth and foundation450132.559625
6Providing and fixing in cement mortar 1:6 (1cement, 6sand) flag stone slab over drains.-50 mm thick157.527843785
7Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars2099.2550.8106641.9
8Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 30 Kms. and part there of upto 50 Kms.220.96189.3641840.9856
9Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.11832918329
Total Activity 548000
S.NoMaterialQuantityUnit PriceTotal
1Convergence Amount1447000447000
Total Material 447000