State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: BANS
Work Code: 1713004028/RC/22012034340305 (टी यस 183 सुदूर ग्राम संपर्क सड़क निर्माण प्रधानमंत्री रोड से जगदीश पटेल के घर तरफ ल० 400मी०)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2017-2018 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : No
Proposal Date : 19/4/2017 Work start date : 2/6/2017
Present status : Gravel Road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 183/28 Sanction Date : 31/5/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
161000 279000 0 0 0 0 0 279000 0 440000
Financial Sanction Details
Financial\Administrative Sanction No: 24/28 Financial\Administrative Sanction Date 31/5/2017
Fin. Sanc. Amt. (in Rs) NREGA:440000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
440000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard015000
2Site clearance, cutting grass, raking into heaps and removing off the premises10241.71740.8
3Dag-beling-Single spade stroke minimum 75mm deep4800.3144
4Transportation of metal 713.148112.4180164.96668
5Transportation of metal 312.16412.02128616.1632
6Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-600mm dia4964.43857.6
7Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making494.1721.610674.072
8Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor692.522315927.96
9Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work373.54287.332610.2166
10Collection of puddle earth including stacking at quarry513.148121.362244.8524
11Collection of hard moorum including stacking at quarry.574.16140.780784.312
12SIGN BOARD169346934
13Labour difference in case of old SoR10115916059
Total Activity 440000
S.NoMaterialQuantityUnit PriceTotal
1Compaction of Earth Work294.1416.94970.966
2Compaction of GSB12500025000
3Compaction of Selected soil11000010000
4contigency11200012000
5Gravel or moorum12500025000
6hume pipe11000010000
7Rolling Earth & moorum170007000
8Soil transport15000050000
9sub grade watring12500025000
10Transportanion of hard Muram11000010000
11Transportation of GSB12540025400
12watering11200012000
13बोर्ड11250012500
14मुरम12500025000
15रोलर12500025000
Total Material 279000