S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Labour only for Cement Mortar | 35 | 190 | 6650 |
2 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 4.1 | 139 | 569.9 |
3 | Earth work in rough excavation, filling excavated earth into depressions on banking as directed, top surface to be levelled and neatly dressed.-Dense or hard soil | 35 | 250 | 8750 |
4 | Boring holes 3.5m deep in ordinary soil (for cast in situ piles) and getting out the soil (under ramming if any shall be paid for separately) and disposal of the surplus excavated soil as directed within a lead of 50m for-Diameter of piles.-200 mm | 6 | 760.2 | 4561.2 |
5 | Extra for under-ramming inside the bore holes for under reamed piles.-200mm | 6 | 302.5 | 1815 |
6 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 13.53 | 282.7 | 3824.931 |
7 | Providing and laying in foundation, plinth and under floors lime concrete with 40mm nominal size graded stone aggregates (metal) and 40% lime mortar. i/c ramming in layers and curing complete excluding cost of form work.-Lime mortar 1:2 (1lime putty, 2sand) | 9.474 | 4836 | 45816.264 |
8 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 1.702 | 2941.3 | 5006.0926 |
9 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Lime Mortar 1: 2(1lime, 2sand) | 2.75 | 3679.1 | 10117.525 |
10 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Lime surkhi mortar 1:1:1 (1lime, 1surkhi, 1sand) | 10.57 | 3933.3 | 41574.981 |
11 | Half brick masonry in class 25 open bhatta or pajawa burnt brick in super structure including placing of 6mm iron bar at every 3rd layer of brick.-In cement mortar 1:3 | 22.37 | 499.8 | 11180.526 |
12 | Steel work in single section including in cutting, hoisting fixing in position in R.S. joists, channels, angles, tee. | 660 | 77.8 | 51348 |
13 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars | 777.62 | 60.8 | 47279.296 |
14 | Providing hard drown steel for R.C.C. work upto floor two level. | 12 | 214 | 2568 |
15 | 15mm thick cement plaster on rough side of wall in-Cement mortar 1:3 (1cement, 3sand) | 177.86 | 142.7 | 25380.622 |
16 | White glazed tiles 6mm thick in flooring, treads of steps and landings laid on a bed of 12mm thick cement mortar 1:3 finished with flush pointing in white cement. | 52.82 | 926 | 48911.32 |
17 | 25mm cement concrete toping 1:2:4 (1cement, 2sand, 4graded stone aggregate 12.5mm nominal size) finished with floating coat of neat cement (base concrete to be paid separately) | 8.2 | 568.9 | 4664.98 |
18 | Cement washing (Portland cement) 2 coats.-Gray cement | 177.86 | 17.5 | 3112.55 |
19 | Oil bound distemper of approved quality of any shade two coats on new works including priming coat. | 177.86 | 76 | 13517.36 |
20 | Painting with enamel paint, brushing, interior to give an even shade I/n cleaning the surface of all dirt dust and other foreign matter on steel and other metal surfaces.-3 coats | 44.04 | 104.6 | 4606.584 |
21 | Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for | 6 | 500 | 3000 |