S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 324 | 6.65 | 2154.6 |
2 | Dag-beling-Single spade stroke minimum 75mm deep | 200 | 0.38 | 76 |
3 | Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering. | 40.5 | 1374.65 | 55673.325 |
4 | Providing and laying damp proof course 50mm thick with C.C.1:2:4 with 20mm size graded stone aggregate. including curing. | 21.6 | 3920.69 | 84686.904 |
5 | False work for R.C.C. and P.C.C. work in plinth and foundation | 54 | 172.01 | 9288.54 |
6 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Lime mortar 1:2 (1lime putty, 2sand) | 226.8 | 2699.5 | 612246.6 |
7 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Flush pointing | 135 | 109.18 | 14739.3 |
8 | Stacking without boxing.-Masonry stones, pitching stones or boulders | 226.8 | 44.16 | 10015.488 |
9 | Transportation of metal | 59.508 | 234.04 | 13927.25232 |
10 | Transportation rates for Masonry stone. | 226.8 | 352.15 | 79867.62 |
11 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 110.5 | 226.38 | 25014.99 |
12 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 561.6 | 148.33 | 83302.128 |