S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 144 | 156 | 22464 |
2 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 1 | 22775 | 22775 |
3 | Labour only for lime mortar & lime surkhi mortar | 88 | 3039 | 267432 |
4 | Cement Lime Mortar 1:1:4 ( 1 cement, 1 lime putty, 4 sand ) | 172.5 | 116.64 | 20120.4 |
5 | Cement Lime Mortar 1:1:8 ( 1 cement, 1 lime putty, 8 sand ) | 23 | 166.8 | 3836.4 |
6 | Labour only for cement lime mortar | 172.5 | 116.64 | 20120.4 |
7 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil | 23 | 166 | 3818 |
8 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 27548.604 | 1 | 27548.604 |
9 | Providing and laying damp proof course 50mm thick with C.C.1:2:4 with 20mm size graded stone aggregate. including curing. | 12.08 | 3947.45 | 47685.196 |