S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 1912.5 | 6.64523921568628 | 12709.02 |
2 | Providing stone chips under stone pitching | 360 | 454.87925 | 163756.53 |
3 | (a) Other then black trap Basalt or granite | 134.55 | 301.756893348198 | 40601.39 |
4 | (a) Consolidation of Moorum /earth work (rate for 1Cum. of Moorum /earth work) | 3107.25 | 2.38837557325609 | 7421.28 |
5 | (XI) 6 Km. Lead | 134.55 | 262.241471571906 | 35284.59 |
6 | (III) 1.5 Km. Lead | 1023.75 | 77.9294358974359 | 79780.26 |
7 | (XII) 7 Km. Lead | 1901.25 | 179.096415516108 | 340507.06 |
8 | (XV) 10 Km. Lead | 182.25 | 210.634293552812 | 38388.1 |
9 | (a) Boulders | 126 | 576.088095238095 | 72587.1 |
10 | For earthen dam - puddle filling of good clay including lead upto 20 meter including mixing, watering & kneading by tamping , ramming & laying etc. | 182.25 | 428.469245541838 | 78088.52 |
11 | Hearting, casing/cut off filling soil etc.
At optimum moisture content to achieve maximum dry density by mechanical sheep foot roller/ vibratory compacters including watering, required leads and lifts and material etc. complete. | 3107.25 | 21.7850768364309 | 67691.68 |
12 | a (iii) Loose or soft soil for Tank Work | 79.99 | 100.973246655832 | 8076.85 |
13 | b (iii) Dense or hard soil for Tank Work | 1023.75 | 136.306246642247 | 139543.52 |
14 | c (iii) Hard moorum for Tank Work | 1989 | 181.559924585219 | 361122.69 |
15 | a (i) Disintegrated or soft rock (not requiring blasting) for Tank Work | 92.59 | 577.407387406847 | 53462.15 |