S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | 413A-416A Provindingh And laying infoundation plinth and underfloor Cement concrt with 20mm Nominal size CC1-2-4 | 46.22 | 2634.4 | 121761.968 |
2 | 2512 collcetion of hard moorum including staking at quarry | 63.99 | 102 | 6526.98 |
3 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms. | 15.44 | 207.9 | 3209.976 |
4 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 50 Kms. and part there of upto 100 Kms. | 72.56 | 621 | 45059.76 |
5 | Transportation of sand | 36.28 | 131.4 | 4767.192 |
6 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 63.99 | 97.11 | 6214.0689 |
7 | Site clearance, cutting grass, raking into heaps and removing off the premises | 450.3 | 1.5 | 675.45 |
8 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 6.43 | 73.4 | 471.962 |
9 | 0413 Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work
| 35.55 | 2021.8 | 71874.99 |
10 | 2502 (b1)- Earth work in Dense or hard soil for Road Work | 0 | 0 | 0 |
11 | 2003-labour only for mooram kanker shingle gravel red bajri leavelling to gradient and required camber including dressing | 63.99 | 21.3 | 1362.987 |
12 | 2513 Preparation of subgrade by excavating earth work to the 15cm average depth,dressing to chamber including making good the undulations etc.and disposal of surplus earth with lead upto 20metres and upto 1.5metre
(a) Loose or soft soil sqm 8.6
| 426.6 | 11.6 | 4948.56 |
13 | labour deffrence | 0 | 0 | 0 |
14 | 2502 - Earthwork in bulk excavation ( exceeding 30 cm in depth ) 1.50M in width as well as 10 Sqm on plan) including disposal of excavated soil lead upto 50M and lift upto 1.50M, disposed soil to be levelled and neatly dressed. | 0 | 0 | 0 |
15 | 430 False Work for R.C.C. and P.C.C. work in plinth and foundation | 79.99 | 139.1 | 11126.609 |