S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Flooring-Conglomerate floor 50 mm thick cement concrete topping 1:2:4 (HSR No. 14.10). | 4.18 | 628.442583732057 | 2626.89 |
2 | Plastering and Pointing - 12 mm thick cement plaster 1:5 on walls (HSR No. 15.6) | 18.58 | 154.637782561895 | 2873.17 |
3 | Road Work - Description : Dry brick-on-edge paving sand grounted over 50 mm thick earth and mud plaster (HSR No. 14.20). | 3187.8 | 439.238465399335 | 1400204.38 |
4 | Road Work - Earth work in filling, laying 23cm layers, breaking of clods, compaction(Durmut) dressing of chennal/nalah berm, disposal of excavated soil near chennal/nalah.- 1.5 meter vertical lift and 15 meter horizontal lead - a) Ordinary Earth | 1143.45 | 160.203996676724 | 183185.26 |
5 | Road Work- Laying brick on end edging lengthwise 22.86 cm deep and 6.83 cm wide including excavation of earth and refilling the excavated soil and compacting along brick edging complete in all respect with other than brick soiling complete in all respect as per HSR 24.6 b. | 1848 | 65.5185497835498 | 121078.28 |
6 | Brick Work - First class brick work laid in cement sand mortar 1:5 in foundation and plinth (HSR No. 11.3) | 6.367 | 4662.95115438982 | 29689.01 |
7 | Sewerage & Drainage - Lowering plain /RCC pipes into trenches for all depths and laying out the same to correct alignment, gradient, level of NP2 with collar jointed with stiff mixture of c.mortar in 1:1.5 ratio including testing of joints HSR 29.44+29.45 (D) 450 mm internal dia of pipe | 20.117 | 998.481383904161 | 20086.45 |