State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: ROHNAI
Work Code: 1725006040/IF/29 (कपिल धारा मय मेंढ बंधान नन्‍ना गोकुल (रोहनाई))
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2009-2010 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 28/11/2009 Work start date : 8/12/2009
Present status : Existing Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : _707 Sanction Date : 9/12/2009
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
78000 33000 0 0 0 0 0 33000 0 111000
Financial Sanction Details
Financial\Administrative Sanction No: _110 Financial\Administrative Sanction Date 10/12/2009
Fin. Sanc. Amt. (in Rs) NREGA:111000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
111000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil41.4431.31297.072
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil19231.36009.6
3Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead9420.41917.6
4Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1:2 (1cement, 1sand, 2graded stone aggregate 20 mm nominal size)4.312313.279970.1937
5False work for R.C.C. and P.C.C. work in plinth and foundation86.35120.6610418.991
6Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars115.3241.724811.1504
7Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 2.9212614.8
8Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil22.6752.41187.908
9Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum22.6768.21546.094
10Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)45.34168.27626.188
11Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.18524044400
12work charge12120021200
Total Activity 111000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL125002500
2Board110001000
3BULLOCK CART122503000
4Cement(bori)292065974
5Centering and Shuttering591207080
6CONTANGANCY310163048
7MASON (PERDAY)123504200
8Photocopy & staionary120002000
9Photograph920180
10photographs111
11Sand116001600
12STEEL57.57422417.94
13Transportation charges of material111
Total Material 33100