Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 05:15:48 PM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: BALADI Panchayat: BHAGWANPURA
Work Code: 1725001005/IF/22012034450665 (KHET TALAB NIRMAN KARYA BABULAL / DUBALU )
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 2/10/2018 Work start date : 6/1/2019
Present status : Not Exist Proposed Status : Construction of Farm Ponds for Individuals
Tech Sanction Details
Technical Sanction No. : 289/2018/ Sanction Date : 17/12/2018
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
54600 36400 0 0 0 0 0 36400 0 91000
Financial Sanction Details
Financial\Administrative Sanction No: 03/2018/ Financial\Administrative Sanction Date 6/1/2019
Fin. Sanc. Amt. (in Rs) NREGA:91000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
91000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Extra for every additional lift of 1.5 m or part there of-Loose/soft soil and dense/hard soil10198019800
222cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014106141.5115000.06
3Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.104395.7543957.5
4Earth work in rough excavation,filling excavated earth into depressions on banking as directed ,top surface to be levelled and neatly dressed.-Hard moorum2.7450012150
Total Activity 91000
S.NoMaterialQuantityUnit PriceTotal
1Transportation charges of mate4040016000
2Transpotation Charges5035017500
3Water Supply47252900
Total Material 36400