S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 6225.93 | 44.5 | 277053.885 |
2 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 2805.84 | 15 | 42087.6 |
3 | Extra for every additional lift of 1.5 m or part there of-Loose/soft soil and dense/hard soil | 2805.84 | 4 | 11223.36 |
4 | contingency | 9911 | 1 | 9911 |