Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 05:24:11 PM 
Back  
State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: DHARAI
Work Code: 1702001041/RC/394 (अटलविहारी के गोडा से सोखीराम के मकानतक )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2012-2013 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : No
Proposal Date : 14/4/2012 Work start date : 14/4/2012
Present status : No Road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 38/41 Sanction Date : 29/6/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
33000 22000 0 0 106000 0 0 128000 0 161000
Financial Sanction Details
Financial\Administrative Sanction No: 7425 Financial\Administrative Sanction Date 9/8/2012
Fin. Sanc. Amt. (in Rs) NREGA:55000 Panchparmeshwar
106000
Scheme 2
0
Scheme 3
0
Total
161000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard125002500
2Dag-beling-Double spade "v" shaped stroke 100mm deep1710.468.4
3Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete.31.86378.612062.196
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)36.4232511.591476.3645
5False work for R.C.C. and P.C.C. work in plinth and foundation66.52121.88102.136
6Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)101.466608.76
7Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 31.865.2165.672
8Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 36.42329.21063.5516
9Transportation of 20 MM metal30.96656.620328.336
10Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.11000010000
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work43.2667.82933.028
12contingency186168616
13Labour difference in case of old SoR125192519
Total Activity 161000
S.NoMaterialQuantityUnit PriceTotal
1CEMENT(BEGS)8326521995
2Convergence Amount1106000106000
Total Material 128000