S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing. | 1 | 41 | 41 |
2 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 110 | 25 | 2750 |
3 | contingency | 1 | 1066 | 1066 |
4 | Applying chemicles in soil around plants Mandays per hundred. | 330 | 60 | 19800 |
5 | Layout of Field for per digging of pits for plantation work. | 3200 | 0.5 | 1600 |
6 | Preperation of pits for plantation of poly plants including mixing of soil manure fertilizer and insecticides with first watering etc. complete. | 330 | 15 | 4950 |
7 | Supply of vermi compost | 110 | 7.5 | 825 |
8 | Supply of singal super phosphate (SSP) | 27.5 | 6.08 | 167.2 |
9 | Supply of muriate of potash (MOP) | 13.75 | 16.98 | 233.475 |
10 | Supply of urea. | 13.75 | 6 | 82.5 |
11 | Supply of Themate, phorate 10 G pesticites | 2.75 | 65 | 178.75 |
12 | Supply of foresty or horticulture Plant cost 3 to5 feet . height | 163 | 30 | 4890 |