S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Contingency | 1 | 14310 | 14310 |
3 | Work charge | 1 | 10854 | 10854 |
4 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 357.75 | 15 | 5366.25 |
5 | Labour only for item no.0402 | 129.71 | 24.6 | 3190.866 |
6 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 0.62 | 2498 | 1548.76 |
7 | Random/ uncoursed rubble masonry in plinth and foundation, stones laid dry, well bounded, faced with selected stones and built with through stones evenly placed at the rate of two per sqm | 100.62 | 995.19 | 100136.0178 |
8 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:6 (1cement, 6sand) | 4.92 | 1670.6 | 8219.352 |
9 | TRANSPORTATION OF MATERIAL | 1 | 23943 | 23943 |
10 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Flush pointing | 24.61 | 53.7 | 1321.557 |
11 | Earth work in rough excavation,filling excavated earth into depressions on banking as directed ,top surface to be levelled and neatly dressed.-Dense or hard soil | 460.46 | 178.32 | 82109.2272 |