S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 1540 | 7.60931818181818 | 11718.35 |
2 | Single spade stroke minimum 75mm deep | 420 | 0.438285714285714 | 184.08 |
3 | (b) C.C. 1:3:6 (1cement, 3sand, 6metal) | 4.56 | 3467.98903508772 | 15814.03 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 20mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work ( if 20 mm metal is used in place of 40mm metal in item number 04.13 & 04.15)
(a) C.C. 1:2:4 (1cement, 2sand, 4metal) | 21.568 | 4408.24554896142 | 95077.04 |
5 | False work for R.C.C. and P.C.C. work in plinth and foundation. | 78.052 | 191.199328652693 | 14923.49 |
6 | (a) Consolidation of Moorum /earth work (rate for 1Cum. of Moorum /earth work) | 140.4 | 2.73490028490028 | 383.98 |
7 | (IV) 2.0 Km. Lead | 140.4 | 185.564886039886 | 26053.31 |
8 | (X) 5.0 Km. Lead | 110.6 | 187.266907775769 | 20711.72 |
9 | (IV) 2.0 Km. Lead | 3049.6 | 119.291690713536 | 363791.94 |
10 | (a) Boulders | 110.6 | 927.348643761302 | 102564.76 |
11 | For earthen dam - puddle filling of good clay including lead upto 20 meter including mixing, watering & kneading by tamping , ramming & laying etc. | 140.4 | 490.630626780627 | 68884.54 |
12 | (c) Hard moorum for Tank Work, lift of up to 3m depth | 97.2 | 183.982510288066 | 17883.1 |
13 | Hearting, casing/cut off filling soil etc.
At optimum moisture content to achieve maximum dry density by mechanical sheep foot roller/ vibratory compacters including watering, required leads and lifts and material etc. complete. | 3049.6 | 23.1489670776495 | 70595.09 |
14 | Benching the seat of embankment to an average depth of 15cm and cross slope of 1 in 12 including cleaning of all foreign material, vegetation and other growth like grass and plant roots and removing the rubbish up to a suitable distance and dressing etc. complete. | 231 | 187.297489177489 | 43265.72 |
15 | (b) Dense or hard soil (PT/45/45) | 18.72 | 193.565705128205 | 3623.55 |
16 | b-(i) Hard moorum (CP/3/0.45) | 25.2 | 181.992857142857 | 4586.22 |
17 | Collection of puddle earth including stacking at quarry | 140.4 | 210.772150997151 | 29592.41 |
18 | 22cm thick dry stone pitching ( without quarry spalls ) with individual stone of 22 cm depth and minimum size 0.014 cum | 420 | 444.225595238095 | 186574.75 |
19 | Loosing of hard soIl such as moorum etc. By ploughing (tractor ect.) the existing ground exceeding 30cm in depth as well as 10 sqm on plan including all running expanses of machine. | 3049.6 | 3.05100013116474 | 9304.33 |
20 | Spreading dressing, breaking of clods of ploughed earth upto 20m lead and lift upto 1.5m disposed soil to be leveled and neatly dressed. | 3049.6 | 85.6886050629591 | 261315.97 |
21 | Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works ) | 1 | 4175.75 | 4175.75 |