State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: CHHAIGAON DEVI
Work Code: 1725006015/IF/9993742138 (कपिल धारा कूप महेंद्र रामकिशन छैगाँवदेवी)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 27/12/2015 Work start date : 19/3/2016
Present status : Existing Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : 1808 Sanction Date : 18/3/2016
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
178000 83000 0 0 0 0 0 83000 0 261000
Financial Sanction Details
Financial\Administrative Sanction No: 42/2015 Financial\Administrative Sanction Date 19/3/2016
Fin. Sanc. Amt. (in Rs) NREGA:261000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
261000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises325.3175.93
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil54.732.261764.622
3Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works)744950.214899
4Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1:2 (1cement, 1sand, 2graded stone aggregate 20 mm nominal size)6.593908.625757.674
5False work for R.C.C. and P.C.C. work in plinth and foundation134.07167.222416.504
6Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars18066.411952
7Stacking and boxing.-Moorum or sand4.516.473.8
8Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.10.04366.333677.9532
9Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil19.2374.11424.943
10Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum19.2398.11886.463
11Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)25.253057701.25
12Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.290.1567.15164530.215
13work charge139003900
Total Activity 261000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL.4.9213456617.4
2Balsting Work28511833630
3Cement(bori)3630010800
4Centering and Shuttering100100.310030
5Contagecny191009100
6Sand Transportation311953585
7STEEL180519180
Total Material 83000